top of page
SPECIFICATIONS

Cantilevered Canopies to ensure smooth Operations even during rainy Season
Individual warehouse gate with
Security cabin
Individual warehouses
staff entry
Individual
parking
to Staff
Air changes Achieved with
Roof monitor
& Louvers

1

2

3

4

5






6
7
8
9
10
11
Concrete
roads inside the logistics park
Canteen and
rest room facilities
Warehouse have strip light on the roof to allow maximum use of natural light
Dock pits for Straight dock levellers
Driver rest room & driver bath & toilet area outside the warehouse.
Scrap Area

Drainage
pipe
Cantilevered Canopies to ensure smooth Operations even during rainy Season .
Ramp for
forklift
Fire door
exit
Dock pits for Angular dock levellers

1

2

3

4

5




6
7
8
9
Docks at 1.2 mt
to allow
docking of vehicles
3.0 MT high boundary
wall all
around
Brick wall up to 3.9 mt without any opening other than rolling shutter & emergency exits for safety
Common D.G sheet area

Trucks
Parking area
Driver common toilet
Conference room & dormitory arrangement in the logistics park
Admin office
with
conference
room
Smooth traffic flow design of park

1

2

3

4

5




6
7
8
9

10
Beautiful entry gate with security with controlled entry & exit to the park
Adequate number of motorbike & car parking for staff of the WHS
Rolling shutters positioning for smoot operation loading & unloading
Straight & Angular docking as per Requirement
Dedicated branding
spaces
bottom of page